Public Consultations
The Coming executive summary of CEC
In cooperation with Egypt Expo and Convention Authority (EECA), EcoConServ Environmental Solution is currently preparing the Public Consultation for presenting the draft findings of the Environmental and Social Impact Assessment (ESIA) study for Cairo Expo City. The Public consultation will be held on Monday 27th June 2011 at Cairo International Convention & Exhibition Center CICC ground, Nasr City, Cairo
Download the Arabic Executive Summary of the Cairo Expo City.
Abo Homos-Nubaria Natural Gas Pipeline
In cooperation with The Egyptian Natural Gas Company (GASCO), EcoConServ Environmental Solution is currently preparing the Public Consultation for presenting the draft findings of the Environmental and Social Impact Assessment (ESIA) study for Abo Homos-Nubaria Natural Gas Pipeline. The Public consultation will be held on Wednesday 25th May 2011 at the Social Club in Damnhour, Behaira Governorate.
Download the Arabic Executive Summary of the ESIA for Abo Homos-Nobaria Natural Gas Pipeline.
Badr Substation 500/220 kV and its interconnections, and the interconnection to Giza North Power Station CC 3x 750 MW
In cooperation with the Egyptian Electricity Transmission Company (EETC), EcoConServ Environmental Solution is currently preparing the Public Consultation for presenting the draft findings of the Environmental and Social Impact Assessment (ESIA) study for Badr Substation 500/220 kV and its interconnections, and the interconnection to Giza North Power Station CC 3x 750 MW. The Public consultation will be held on Tuesday 31st May 2011 at Pyramisa Hotel, Giza
· Download the Arabic Executive Summary of the ESIA for Badr Substation and its interconnections.
· The Arabic executive Summary of the ESIA for the interconnection to Giza North Power Station CC 3x 750 MW (coming soon)
Ashmoun 220/66/11 kV and Abu Ghaleb 220/66/11 kV substations and their interconnections
In cooperation with the Egyptian Electricity Transmission Company (EETC), EcoConServ Environmental Solution is currently preparing the Public Consultation for presenting the draft findings of the Environmental and Social Impact Assessment (ESIA) study for Ashmoun 220/66/11 kV and Abu Ghaleb 220/66/11 kV substations and their interconnections. The Public consultation will be held on Wednesday 1st June 2011 at Monoufia University Hotel, Monoufia
Download the Arabic Executive Summary of the ESIA for Ashmoun and Abu Ghaleb substations and their interconnections